By: Contributor(s): Material type: TextTextSeries: Environmental earth sciences ; Volume , number ,Verlag Springer 2013Content type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
Subject(s): Online resources: Summary: A large number of deep cuts are formed during the construction of expressways in mountainous areas. Inadequate interpretation of ground conditions is a major contributing factor to the failure of cut slopes. This study focuses on the Hongyan landslide along the S26 expressway. Due to lack of an adequate pre-construction investigation, a landslide was triggered by small-scale excavation at the toe part of the slope. The potential slip surface was incorrectly located; consequently, two rows of stabilizing piles were not long enough to reach stable rocks. To overcome the mistake, two additional rows of piles were installed. During construction, both slope deformation and the stress of reinforced bars in piles were monitored for safety considerations. A Verhulst model-based failure forecast was also utilized to insure the stability of the slope during remedial works. Reviewing this landslide reveals a number of lessons. First, sufficient geological investigation and careful interpretation of ground conditions are mandatory prior to the design of a cut slope. Second, systematic field monitoring is strongly recommended, especially when the geology of the slope is complex and it is difficult to determine failure patterns. Third, the failure forecast can serve as a supplementary measure to insure the safety of workers and slopes. Last, it always takes some time for stabilizing piles to mobilize.
Reviews from LibraryThing.com:
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Vol info Status Notes Date due Barcode
Journal Article Journal Article Main Library - Special Collections GE105 ENV (Browse shelf(Opens below)) Vol.69 , No.7 (Aug 2013) Not for loan For In House Use Only

A large number of deep cuts are formed during the construction of expressways in mountainous areas. Inadequate interpretation of ground conditions is a major contributing factor to the failure of cut slopes. This study focuses on the Hongyan landslide along the S26 expressway. Due to lack of an adequate pre-construction investigation, a landslide was triggered by small-scale excavation at the toe part of the slope. The potential slip surface was incorrectly located; consequently, two rows of stabilizing piles were not long enough to reach stable rocks. To overcome the mistake, two additional rows of piles were installed. During construction, both slope deformation and the stress of reinforced bars in piles were monitored for safety considerations. A Verhulst model-based failure forecast was also utilized to insure the stability of the slope during remedial works. Reviewing this landslide reveals a number of lessons. First, sufficient geological investigation and careful interpretation of ground conditions are mandatory prior to the design of a cut slope. Second, systematic field monitoring is strongly recommended, especially when the geology of the slope is complex and it is difficult to determine failure patterns. Third, the failure forecast can serve as a supplementary measure to insure the safety of workers and slopes. Last, it always takes some time for stabilizing piles to mobilize.

There are no comments on this title.

to post a comment.